Oh my! What a mess!

The kitchen project is coming along. We having been moving right along with getting the kitchen emptied and ready. Most of the cabinets are out, with the exception of the one over the stove, which has the microwave attached to it. And the sink cabinet, which is coming out tomorrow. The backsplash has been removed and the tile floor has been removed, except for under the sink.

Our installers will be here tomorrow to check out what we have gotten done, and tell us if there is anything else we need to take care of before they start on Monday. They will be starting with a little demo work. The soffits are coming down, as well as two walls, one alongside where the fridge sits, and one alongside the stove. Taking these down will open things up just a bit.

I can’t stand the mess!! My entire house is a huge disaster right now. But, I know it will be worth it when it’s all done!

Here’s a picture of Adam working his butt off ripping up the tile floor.

image

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s